Roccosculptures for Rolex
Step 1 Flooring
The Roccosculptures team began the work by placing a plastic sheet on the concrete and then creating an anti-rising screed using Mapei Elastick.
Once the screed had dried we began assembling the flooring made of Travertine Paglierino and Travertine Noce.
Roccosculptures for Rolex
Step 2 Office flooring and baseboard


Roccosculptures for Rolex
Step 3 coverings
The Roccosculptures team began to mount the 2cm thick Travertine on the 5mm thick perforated steel walls,
managing to combine 3 different materials such as BRASS, ALUMINUM and TRAVERTINE.
Respecting all the joints between the various pieces and combining the natural grain present on the Travertine.
Roccosculptures for Rolex
Step 4 Rolex wall
2cm thick Travertine on the 5mm thick perforated steel walls with brass showcase


Roccosculptures for Rolex
Step 5 restroom
Travertine Paglierino and Wood.
Roccosculptures for Rolex
Step 6 Exterior
Stairs and walls covering in Travertine Noce and brass.